Jeddah – Jizan Coastal Road, Part 17 Link between Ad Darb - Sabya

Project Name:Jeddah – Jizan Coastal Road, Part 17 Link between Ad Darb - Sabya
Client:Ministry of Transport
Construction Cost:SR 141.8 Million
Gross Floor Area:
Period/ Completion:2004 - 2010
Project Description

Construction of dual carriage way each consist of three

lanes roads.

Construction of 6 bridges that crosses valley.

Widening of 6 existing bridges using deep pipes

foundation.

1,600,000 square meter of Asphalt base coarse layer.

1,600,000 square meter of Asphalt wearing coarse layer.

600,000 m3 of Aggregate base course.

1,500,000 m3 of earth works.

Construction of complete hydraulic structures Including

bridges, box culverts, slope protection, utilities as well as

drainage pipelines

Earthwork filling including sub-grade with compaction  

of 100 %.

Safety items including pavement painting and sign board.

 Curb stone that isolate the two carriage ways.

Other Projects in the field of Roads & Bridges

Harmain High Speed Railway Phase1, Package1

40kms Road project at King Abdullah Sports City in Jeddah

16kms Jeddah - Makkah Highway Link Phase2

Jubail Bridge Construction Project

Riyadh Secondary Road (Phase1)

Connecting of industrial city with Al-Kharj / Riyadh Highway

Saudi – Yemeni Boarders Roads. Jalat Al Hayat Part

Taif – Baha – Abha Roads. Part 3

Jeddah – Jizan Coastal Road, Part 17 Link between Ad Darb - Sabya

Upgrading of Roadways – Group 14 in Jizan