Our Projects

Roads & Bridges

Taif – Baha – Abha Roads. Part 3

Project Name:Taif – Baha – Abha Roads. Part 3
Client:Ministry of Transport
Construction Cost:SR 234 Million
Gross Floor Area:
Period/ Completion:2004 - 2009
Project Description

Construction of new two lanes and upgrade existing road including constructing of wadi bridges. Design of double lanes road that climbing high mountain.

Construction of complete hydraulic structures including

bridges, box culverts, slope protection as well as drainage

pipelines

Excavation of 5,000,000 m3 in hard rock using high power

bulldozers and jack hammer and Rock blasting.

Earthwork filling of 4,000,000 m3 including sub grade with

achieving compaction of 100 %.

Asphalt pavement that cover an area of 1,200,000 m2.

Safety items including: pavement painting, cat eyes

and sign board.

Other Projects in the field of Roads & Bridges

Harmain High Speed Railway Phase1, Package1

40kms Road project at King Abdullah Sports City in Jeddah

16kms Jeddah - Makkah Highway Link Phase2

Jubail Bridge Construction Project

Riyadh Secondary Road (Phase1)

Connecting of industrial city with Al-Kharj / Riyadh Highway

Saudi – Yemeni Boarders Roads. Jalat Al Hayat Part

Taif – Baha – Abha Roads. Part 3

Jeddah – Jizan Coastal Road, Part 17 Link between Ad Darb - Sabya

Upgrading of Roadways – Group 14 in Jizan