Taif – Baha – Abha | Saudi Arabia
Construction of new two lanes and upgrade existing road including constructing of wadi bridges. Design of double lanes road that climbing high mountain. Construction of complete hydraulic structures including bridges, box culverts, slope protection as well as drainage pipelines Excavation of 5,000,000 m3 in hard rock using high power bulldozers and jack hammer and Rock blasting. Earthwork filling of 4,000,000 m3 including sub grade with achieving compaction of 100 %. Asphalt pavement that cover an area of 1,200,000 m2. Safety items including: pavement painting, cat eyes and sign board.
With our expertise across multiple sectors we are well placed to help our clients to bring thier visions to life . Click below for more information and contact details
Contact us